Design, Implementation, and Installation of Chlorine Gas Leak Protection System

At APS, our expertise merges advanced safety engineering with precise execution—delivering robust chlorine gas leak protection systems that ensure secure, compliant, and reliable operations in critical water treatment facilities.

Design, Implementation, and Installation of Chlorine Gas Leak Protection System

about project

APS was commissioned to develop a turnkey chlorine gas leak protection system for Heet Station’s wastewater treatment operations. The scope included custom sensor placement, alarm integration, and full interoperability with the station’s SCADA network to safeguard personnel and assets from accidental gas exposure.

H30329218980541cd8319fb09a2d2261cg.jpg_720x720q50
High-sensitivity sensors strategically distributed to ensure immediate detection of even trace gas leaks.
Automated alarm and shutdown with audible and visual alerts, instant system isolation, and emergency shut-off valves to prevent gas spread.
Direct integration with central control and SCADA, enabling real-time monitoring and rapid response.
Redundant fail-safes including backup batteries and dual communication lines to maintain uninterrupted operation during power outages or equipment faults.

Our approach and solution

Advanced Sensor Deployment: Installed high-sensitivity chlorine detectors at strategic points throughout the gas handling areas.

System Integration: Linked detectors to central alarms and the existing SCADA control room for instant alerts.

Engineered Redundancy: Implemented fail-safe communication paths and emergency shutdown protocols.

Training & Documentation: Provided comprehensive staff training and full technical documentation to ensure proper operation and maintenance.

result

Zero False Alarms: Achieved reliable leak detection without disruptive nuisance alerts.

Enhanced Safety: Strengthened HSE compliance and reduced incident risk.

Operational Continuity: Maintained 24/7 treatment processes without downtime during installation.

Regulatory Approval: System passed all National Water Company and civil defense inspections on first submission.

Project Preview

The National Water Company
Nov, 2023
9 Months
Heet Station, Riyadh

Don’t hesitate to contact us

Call us
+966 59 642 0142
Email us
info@aps.sa
Chat with us
https://aps.sa
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare