Design, Implementation, and Installation of Chlorine Gas Leak Protection System
about project
APS was commissioned to develop a turnkey chlorine gas leak protection system for Heet Station’s wastewater treatment operations. The scope included custom sensor placement, alarm integration, and full interoperability with the station’s SCADA network to safeguard personnel and assets from accidental gas exposure.

Our approach and solution
Advanced Sensor Deployment: Installed high-sensitivity chlorine detectors at strategic points throughout the gas handling areas.
System Integration: Linked detectors to central alarms and the existing SCADA control room for instant alerts.
Engineered Redundancy: Implemented fail-safe communication paths and emergency shutdown protocols.
Training & Documentation: Provided comprehensive staff training and full technical documentation to ensure proper operation and maintenance.
result
Zero False Alarms: Achieved reliable leak detection without disruptive nuisance alerts.
Enhanced Safety: Strengthened HSE compliance and reduced incident risk.
Operational Continuity: Maintained 24/7 treatment processes without downtime during installation.
Regulatory Approval: System passed all National Water Company and civil defense inspections on first submission.